服務(wù)導(dǎo)航
Product categories
您當(dāng)前位置:首頁>工程動(dòng)態(tài)工程動(dòng)態(tài)
軟膜膜構(gòu)造的支承構(gòu)造和各項(xiàng)聯(lián)接構(gòu)造應(yīng)契合以下規(guī)范:
發(fā)表時(shí)間:2016-11-25 09:28:12 發(fā)表作者:phpcms 瀏覽次數(shù):
提升檔次和品位,軟膜天花助你一臂之力 膜構(gòu)造的支承構(gòu)造和各項(xiàng)聯(lián)接構(gòu)造應(yīng)契合以下規(guī)范:
To enhance the quality and grade of soft film smallpox help you a helping hand film structure, support structure and the connecting structure should conform to the following specifications:
1、確保聯(lián)接的安全、合理、美麗。
1, to ensure that the connection is safe, reasonable and beautiful.
2、聯(lián)接件應(yīng)具有足夠的強(qiáng)度、剛度和耐久性,應(yīng)不先于所聯(lián)接的膜材、拉索或鋼構(gòu)件損壞,并不發(fā)作影響構(gòu)造受力功用的變形。聯(lián)接處的膜材應(yīng)不先于其它部位的膜材損壞。
The 2 connecting parts should have sufficient strength, stiffness and durability, should not precede the membrane material and the connecting cable or steel parts damaged, does not attack force function of the influence of tectonic deformation. The membrane material of the joint should not be damaged before the other parts of the membrane.
3、聯(lián)接件應(yīng)傳力牢靠,并削減聯(lián)接處應(yīng)力會(huì)集。
3, joint force should be firm, and cut joint stress convergence.
4、節(jié)點(diǎn)構(gòu)造應(yīng)契合計(jì)算假定。應(yīng)思考節(jié)點(diǎn)構(gòu)造偏心對(duì)拉索、膜材發(fā)作的影響,施加預(yù)張力的辦法、構(gòu)造裝置答應(yīng)誤差,以及進(jìn)行二次張拉的也許性。
4, node structure should be fit to calculate the assumption. The influence of the structure of the joints on the attack of the cable and the membrane material, the method of pre tension, the error of the construction device, and the possibility of the two tensile stress should be considered.
5、在膜材聯(lián)接處應(yīng)堅(jiān)持高度水密性,應(yīng)采取必定的構(gòu)造辦法防止膜材磨損和撕裂。
5, at the junction of the membrane material should adhere to a high degree of water tightness, should take a certain structural measures to prevent the wear and tear of the film.
6、對(duì)金屬聯(lián)接件應(yīng)選用牢靠的防腐蝕辦法。 7、在支承構(gòu)件與膜材的聯(lián)接處不得有毛刺、尖角、尖點(diǎn)。
6, the metal connection pieces should choose a reliable anti-corrosion measures. 7, the connection point of the support member and the membrane material remove burrs and sharp edges, sharp point.
膜構(gòu)造的支承構(gòu)造和各項(xiàng)聯(lián)接構(gòu)造應(yīng)契合以下規(guī)范:
The supporting structure of the membrane structure and the connection structure should meet the following specifications:
1、確保聯(lián)接的安全、合理、美麗。
1, to ensure that the connection is safe, reasonable and beautiful.
2、聯(lián)接件應(yīng)具有足夠的強(qiáng)度、剛度和耐久性,應(yīng)不先于所聯(lián)接的膜材、拉索或鋼構(gòu)件損壞,并不發(fā)作影響構(gòu)造受力功用的變形。聯(lián)接處的膜材應(yīng)不先于其它部位的膜材損壞。
The 2 connecting parts should have sufficient strength, stiffness and durability, should not precede the membrane material and the connecting cable or steel parts damaged, does not attack force function of the influence of tectonic deformation. The membrane material of the joint should not be damaged before the other parts of the membrane.
3、聯(lián)接件應(yīng)傳力牢靠,并削減聯(lián)接處應(yīng)力會(huì)集。
3, joint force should be firm, and cut joint stress convergence.
4、節(jié)點(diǎn)構(gòu)造應(yīng)契合計(jì)算假定。應(yīng)思考節(jié)點(diǎn)構(gòu)造偏心對(duì)拉索、膜材發(fā)作的影響,施加預(yù)張力的辦法、構(gòu)造裝置答應(yīng)誤差,以及進(jìn)行二次張拉的也許性。
4, node structure should be fit to calculate the assumption. The influence of the structure of the joints on the attack of the cable and the membrane material, the method of pre tension, the error of the construction device, and the possibility of the two tensile stress should be considered.
5、在膜材聯(lián)接處應(yīng)堅(jiān)持高度水密性,應(yīng)采取必定的構(gòu)造辦法防止膜材磨損和撕裂。
5, at the junction of the membrane material should adhere to a high degree of water tightness, should take a certain structural measures to prevent the wear and tear of the film.
6、對(duì)金屬聯(lián)接件應(yīng)選用牢靠的防腐蝕辦法。
6, the metal connection pieces should choose a reliable anti-corrosion measures.
7、在支承構(gòu)件與膜材的聯(lián)接處不得有毛刺、尖角、尖點(diǎn)。
7, the connection point of the support member and the membrane material remove burrs and sharp edges, sharp point.
軟膜天花防火等級(jí)是多少?軟膜天花是由三個(gè)有些所構(gòu)成的軟膜,扣邊條,龍骨。其間軟膜天花選用格外的資料制成,確保不含污染環(huán)境元素(鎘),其防火等級(jí)為B1(我國(guó)),經(jīng)過一次或?qū)掖吻虚_成形,并用高頻焊接完結(jié),軟膜天花是要依照在實(shí)地丈量出的天花形狀及尺度在工廠里出產(chǎn)制造而成。軟膜天花扣邊條:是半硬質(zhì),揉捏成形的,選用資料,其防火等級(jí)為B1(我國(guó)),A級(jí)防火膜天花被焊接在天花軟膜的附近邊際,以張緊軟膜扣在墻碼條上,能夠到達(dá)完美縫合的作用。
How much is the piamater ceiling fire rating? Soft film smallpox is composed of three strips of some soft, buckle, keel. During the selection of extra soft film ceiling materials, to ensure that does not contain elements of environmental pollution (CD), the fire rating of B1 (China), after one or more open forming, and by high frequency welding end, soft film smallpox is to make production in the factory in accordance with the shape and scale of smallpox in the field of measurement and. Soft film smallpox buckle edge: is semi hard, kneading, forming material selection, the fire rating of B1 (China), a fireproof film is welded to the smallpox smallpox soft film near the margin, with tensioning buckle in soft wall bar code, can reach the perfect stitching effect.
配件:選用鋁合金制成,其防火等級(jí)為A1(我國(guó))。拉膜天花有各式各樣適宜的不相同形狀,直的、彎的,有的是可被切開成適宜的視點(diǎn)后再裝置在一同,并被固定在室內(nèi)天花的附近上,以用來扣住天花軟膜。
Accessories: the use of aluminum alloy, the fire rating of A1 (China). Film pulling with smallpox for every kind of different shapes, straight, curved, some can be cut into the appropriate view after the device together, and are fixed in the vicinity of the indoor ceiling, to fasten the smallpox soft film.
主站蜘蛛池模板:
裸体跳舞XXXX裸体跳舞|
一级黄色片大全|
欧美激情亚洲色图|
再深点灬舒服灬太大了老板|
麻豆国产高清在线播放|
国产精品青青青高清在线观看|
《溢出》by沈糯在线阅读|
日日夜夜天天操|
五月婷婷开心综合|
欧美日韩在线影院|
人妻精品久久久久中文字幕
|
亚洲一成人毛片|
波多野结衣中文字幕一区二区三区
|
日韩欧美亚洲一区二区综合|
亚洲日韩乱码久久久久久|
男女一级爽爽快视频|
四虎国产精品永久在线网址|
顶级欧美熟妇xx|
国产无遮挡吃胸膜奶免费看|
337p色噜噜人体大胆欧美|
在线观看污网站|
peeasian人体|
少妇无码AV无码一区|
中文字幕专区高清在线观看|
日本阿v视频在线观看高清|
欧美xxxx做受性欧美88|
低头看我是怎么c哭你的细节|
精品日韩欧美一区二区三区|
国产三级观看久久|
香港三日本三级人妇三级99|
国产毛片久久久久久国产毛片
|
西西人体www44rt大胆高清|
国产成人综合在线视频|
一级黄色香蕉视频|
国产精品香蕉在线|
91天堂素人精品系列全集亚洲|
在线精品日韩一区二区三区|
heyzo北条麻妃久久|
好男人社区www在线观看|
丁香六月纪婷婷激情综合|
成熟女人特级毛片www免费|